Miami Green Homes


What to do with a damaged wood fence from a Hurricane in Miami or South Florida.

A hurricane can leave much destruction in its wake, but even a small wind event may knock over some vegetation and fences.

Under the Florida Building code a permit is required to repair fences, so where to start? The good news is that after a strong wind event, such as Hurricane Irma, the governor has the ability to declare a state of emergency, as he did for Hurricane Irma. Besides federal aid, this status also allows municipalities to provide expedited permits for homeowners to get back to a normal stats of living.

Many municipalities accept a simplified permit application for simple items such as fences. Miami Dade has a standard detail that most municipalities will provide to homeowners to pull an “owner-builder” permit for minor repairs and replace missing sections of their standard wood fence.

 

wood fence

This detail is in compliance with the Florida building code and most contractors are familiar with this type of installation. In addition to the detail, you need a footprint of the home and boundary of the site, like an old survey. Mark or highlight the area of the fence to be replaced and provide the actual linear feet either as a side note or on a separate sheet. Make sure to reference the current building (as of this writing it the FBC 5th Edition) as the applicable reference code, again a simple note to be added to the plan.

Lastly some municipalities request an estimate of the cost of work. Get this from the contractor that is going to install the fence.

 

More damage than a wood fence? A permit will be required. Contact Sebastian Eilert Architecture to see how we can help. www.SebastianEilert.com 305.253.5786

 

 

Advertisements


Permits and board approvals! Miami overview and nuances…

Often referred to as the “necessary evil”, getting a building permit is a crucial part of any project. While the process may pose a considerable time impact, it is important to remember that the primary objective of a building permit is to ensure that safe structures are provided. Beyond the building code approvals, zoning codes also guide the local flair and style of many neighborhoods and cities. The check and balance of this process should instead be looked at as a safety net for the owner, to ensure that the hired license professionals are indeed doing their job – beyond just design.

SEA has been blessed with a plethora of approvals in the last weeks and we are celebrating alongside our clients;

The building permit process and requirements in the respective municipality are typically common knowledge, however some of the nuances that are required may not be completely known and can add substantial time commitment to the permitting process. Some of the more common approvals we help to obtain are the Coral Gables Board of Architects approval – a process that requires a preliminary and a full approval to present to a panel of volunteer architects, Historic board approval (typically in Coral Gables, Miami Beach and City of Miami) – and special Planning and Zoning approvals, such as the recent success in Miami Shores.

building-permit_Page_1

(Miami Dade County Building Permit Application)

Following are some typical permit applications available online in Miami Dade County; these must be singed and notarized by the respective parties:

County: http://www.miamidade.gov/permits/library/building-permit.pdf

Miami: http://www.miamigov.com/nets/docs/permits/buildingpermitapplication.pdf

Miami Beach: http://web.miamibeachfl.gov/building/scroll.aspx?id=37842

Coral Gables: http://coralgables.com/modules/showdocument.aspx?documentid=741