Miami Green Homes


Pinecrest residence renovation/addition progress – roof and framing (video walk-through)
August 23, 2016, 1:56 am
Filed under: Uncategorized

Great progress at the Pinecrest residence project by S.E.A. All walls and the roof trusses and sheathing are up. 


The existing garage to the right with the new entrance to the left. 


Walk through from the entry. Walls are framed. Grand foyer, dining area, kitchen to the right…then into the private side of the house, future 3 bedrooms and a den with Cabana bath; master suite at end of hall. 


Great backyard with oversized covered patio area. Pool to come. 

Advertisements

Leave a Comment so far
Leave a comment



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s



%d bloggers like this: