Great progress at the Pinecrest residence project by S.E.A. All walls and the roof trusses and sheathing are up.
The existing garage to the right with the new entrance to the left.
Walk through from the entry. Walls are framed. Grand foyer, dining area, kitchen to the right…then into the private side of the house, future 3 bedrooms and a den with Cabana bath; master suite at end of hall.
Great backyard with oversized covered patio area. Pool to come.
Leave a Reply