Pinecrest residence renovation/addition progress – roof and framing (video walk-through)


Great progress at the Pinecrest residence project by S.E.A. All walls and the roof trusses and sheathing are up. 


The existing garage to the right with the new entrance to the left. 


Walk through from the entry. Walls are framed. Grand foyer, dining area, kitchen to the right…then into the private side of the house, future 3 bedrooms and a den with Cabana bath; master suite at end of hall. 


Great backyard with oversized covered patio area. Pool to come. 


Posted

in

by

Tags:

Comments

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: